Open ends and logic
Find activities with missing predecessors or successors and inspect relationship lag that can conceal or distort the driving sequence.
Browser-based schedule analysis software
Check a P6 XER for missing logic, constraints, float, out-of-sequence progress, and dates that conflict with the data date. Review exported longest-path status, resources, calendars, and milestones. Keep successive updates in one project record to analyze schedule change across the full duration of the project.
What the schedule analyzer reviews
Schedule Tracker reads native XER activity, relationship, calendar, resource, and project data. It does not edit the source file or recalculate the CPM network. Each finding connects summary metrics to the underlying schedule evidence.
Find activities with missing predecessors or successors and inspect relationship lag that can conceal or distort the driving sequence.
Review P6 longest-path status, activities at zero or negative total float, and the dates associated with each result.
Surface constrained activities and actual start or finish dates recorded beyond the schedule data date.
Identify work performed outside the planned predecessor-successor sequence and review the affected logic.
List project milestones by WBS, highlight negative float, and keep contractual and intermediate dates visible.
Find duplicate activity descriptions and inspect actual dates, original durations, calendars, and task-level schedule fields.
More than activity dates
A schedule can appear sound at the activity level while still relying on unrealistic assumptions about working time, resource demand, or costs. Review the supporting calendar, resource, and cost data to assess those assumptions.
Available analysis reports
Frequently asked questions
Schedule analysis software checks schedules created in a planning system such as Primavera P6. Schedule Tracker reads XER exports and reports schedule-quality findings with the activity data behind them. It leaves the source file unchanged and works alongside P6.
Schedule Tracker reviews CPM data including open ends, relationship lag, constraints, negative float, critical and longest paths, future actual dates, out-of-sequence progress, calendars, resources, costs, and milestones.
No. Upload an XER export through a modern web browser. Schedule Tracker does not require a direct P6 database connection or a Windows-only desktop installation.
Schedule Tracker supports XER exports created by Primavera P6 version 7.0 or newer. The project should be scheduled in P6 before export so its calculated dates are available for analysis.
Schedule Tracker reports all 14 points, with measured results, thresholds, and supporting findings where the required evidence is available. The Critical Path Test requires network recalculation, so it is marked not evaluated. The results are diagnostic schedule-quality findings; they do not certify the schedule or determine contractual compliance.